Every week somebody drags the bins along it, and every spring it turns to mud. The strip between the driveway and the back gate is worth paving, but on most lots in the Village it is also where the water is supposed to go.

Most houses have a front walk that somebody designed and a side route that nobody did. The side one runs from the drive, past the garage wall, to a gate or the back yard, and in practice it carries more than the front: bins, the mower, bags of mulch, bicycles, the grill tank. It is usually a worn line in the grass, a few stepping stones that tip, or gravel that migrates into the lawn. Paving it is a small job with a big effect on daily life, and it sits naturally alongside concrete patio work, because it usually ends at the back patio anyway. What makes it more than a strip of concrete is the ground it crosses.

What the path is really for

Start with the bins. The Village zoning code keeps garbage and recycling containers at a single-family house in the side or rear yard, out of sight, and bars enclosures for them in a street yard. So on most properties the bins live round the side, and the path is the route they take to the kerb every collection day, full, in every weather. That one weekly trip decides more about the design than anything else.

Wheels want a continuous, even surface without steps. If the ground rises from front to back, a gentle slope along the length beats a single step at the gate, which is exactly where a loaded bin stops dead. The same goes for a mower or a wheelbarrow. Where a step cannot be avoided, put it somewhere the bins do not need to go.

The strip is usually a drainage path

Here is the part that catches people out. On subdivision lots the ground between two houses is rarely flat by accident. It was shaped when the subdivision was graded, to a plan, so that water from the back yards has a route out. Often that route is a shallow grassed swale along or near the side lot line. Where a subdivision is finished with spoil from the basements, the Village's land division rules require rear swales, and side swales that serve more than the two neighbouring lots, to be cut in the first grading pass, with drainage and maintenance easements along them.

Where it comes fromWhat it saysWhy a side path cares
Zoning, sidewalks in a yard3 ft from any lot line, 10 ft from wetland, no blocking or redirecting drainageSets the outer edge and the main condition
Zoning, binsSide or rear yard only at a single-family homeExplains why the path gets used weekly
Land division, gradingWhere basement spoil is used: rear swales, and side swales serving more than two lots, built at initial grading with easementsThe channel may not be yours to fill
Land division, lot plansEach lot's drainage flows, swales and high points shown; as-built survey filed with the VillageA record of the intended grades may exist
Erosion control, small-job exemptionUnder 400 sq ft disturbed and under 5 cu yd of fill, with no change to drainage or approved lot grades, away from wetlandEvery condition has to be met
Erosion control, outside the exemptionPermit required; $1,000 cash deposit for sites under an acre; permit good for 180 daysWhat applies when the job is larger or regrades

The sidewalk clause in the zoning code does not only say how far from the line. It says the walk must not block, redirect or impede the flow of water. For a path between houses that is the real design brief.

Three ways to lay it, and the one we recommend

In the bottom of the swale. Tempting, because it is the flattest line and the route people already walk. It is also the one place the concrete should not go. A slab turns a grass channel into a hard one, speeds the water up, sends it somewhere slightly different, and may sit inside an easement.

Filling the swale and paving over it. This changes the lot grading the subdivision was built to, which is precisely what the small-job exemption excludes, and it moves your water problem onto a neighbour. Not something we would pour.

On the house side, sloped toward the swale. The walk runs between the foundation and the channel, falling gently away from the house so its own water reaches the swale and carries on. The grass channel stays where it was. On most lots this is the answer, and when the gap between the wall and the swale is tight, the walk gets narrower rather than the swale getting filled.

Find the plan before you dig

Because subdivision grading is done to approved plans, and the developer files an as-built survey, there may be a record of what the strip beside your house was meant to do. Ask the Village, or check the survey that came with the house. Knowing where the high point sits and which way the water runs turns a guess into a design.

Walk the strip after a heavy rain as well. Standing water, a line of silt or a downspout emptying straight across the route all tell you something. A downspout discharging onto a walk in January makes a sheet of ice exactly where people carry things, so redirect it at the same time.

Against the foundation

A walk that runs tight to the house needs a clean separation from the wall, not concrete bonded to the foundation, so the two can move independently. It needs to fall away from the house along its whole length. And where it passes a basement window well or a meter, it needs to leave room for both to be reached. A plan that allows for these when the walk is laid out saves an awkward cut later.

Is it a permit job?

A modest walk laid on the house side, with no fill brought in and the swale untouched, may well fit the small-job exemption. Measure the dug area rather than the finished concrete, since the digging and the edges of the base run wider than the slab. A long path that ends at a new patio can pass the size limit quickly, and any plan that reshapes the swale falls outside the exemption whatever its size. When in doubt, ask the Village first, which is cheaper than the stop-work order the chapter also provides for.

If you are planning the side route, the front walk that meets it is covered in the walk from the drive to the door. To have somebody walk the strip with you and price a path that leaves the water alone, ask for a visit through our concrete patio page and mention the side of the house.

Sources

  1. Village of Pleasant Prairie Code, s. 420-139(B)(1)(l) and (s) - where garbage containers are kept at a single-family home, and the distance and drainage conditions on sidewalks in a yard. Read 28 September 2026.
  2. Village of Pleasant Prairie Code, s. 395-69, Grading - side and rear yard swales, their easements, lot grading plans and the as-built grading survey. Read 28 September 2026.
  3. Village of Pleasant Prairie Code, Ch. 381, ss. 381-3 and 381-10 - the minor land activity exemption, the erosion control permit, the cash deposit and permit duration. Read 28 September 2026.

Book a Site Visit

Get your free, on-site quote.

Tell us about your project and we'll call you back the same day to set up a free measure and price.

Get your free quote

Tell us about your project and we will call you back the same day. No obligation.

What are you looking to do?
Roughly how big?
When are you thinking?

Pricing it out is fine. We will not chase you.

What is your ZIP code?

So we can confirm you are in the service area.

Where should we send it?

Free, no-pressure quote · Serving Kenosha County, WI

By submitting, you agree to our Privacy Policy and Terms, and consent to be contacted by phone, text, or email about your project, including by automated means. Consent isn't a condition of purchase. Msg & data rates may apply.

Call (262) 228-5293 Text us